Brussels - The 92 Tram
No. 92 Tram - Brussels
The complementary routing of vicinal and urban tracks and the replacement of key lines by metro has led to some peculiar track layouts, for instance at the Barrière de St-Gilles/Bareel St-Gillis. Of the seven roads that meet at this circular junction, all originally contained tramlines, whereas today only three do. To negotiate a sharp turn, route 18, until it was closed on 1 July 2007, had to make a 270-degree turn on its journey away from the city centre, looping round and crossing its own path.
A further peculiarity is that under the South station, the premetro and metro tracks both swap from running on the right to running on the left where they run parallel to provide cross-platform interchange between the two lines. This serves no apparent purpose, but may be because main line trains in Belgium run on the left. The metro returns to running on the right under the new Jacques Brel depot.
Between 2006 and 2009 a phased transformation of the tram network took place, with the aim of improving regularity and relieving overcrowding. As part of this the premetro service between North station and Albert was restructured with fewer lines passing through it, but at more regular intervals. These routes use the new longer Bombardier trams. The major part of the North-South Axis (from Lemonnier to Rogier) is now only used by lines 3 and 4 during the day. Tram lines 55 and 56 from Schaerbeek (north of Brussels) that used to ride the North-South Axis now stop at Rogier and nearby Gare du Nord/Noordstation.
As part of that plan, line 52 has been replaced by line 3 in the North (from the Brussels-South railway station to Thomas and from Van Praet to Esplanade), and by lines 56 (from Rogier to Princess Elisabeth), 82 (from Drogenbos to Lemonnier) and 32 in the South.
An already implemented part of this plan is the creation of tramway lines 24 and 25. Since April 2007 the new line 25 goes from Rogier to the Boondael/Boondaal railway station following the route of the ex-line 90 from Rogier to Buyl, then leaves the outer ring towards the Université Libre de Bruxelles campus of Solbosch. The (somewhat older) new line 24 strengthens the tram presence on the outer ring during daytime; it goes from the Schaerbeek/Schaarbeek railway station to Vanderkindere in Uccle.
en.wikipedia.org/wiki/Brussels_trams
Trams in Brussels
LUAS
The sleek silver Citadis trams, manufactured by Alstom, reach a top speed of 70 km/h on off-road sections, but travel at a slower speed where conflicts with other vehicles or pedestrians can occur. Red Line trams, at 30 m with a capacity of 235, are shorter than the 40 m Green Line trams, which have a capacity 358 including two wheelchairs.
In other aspects, the two lines are identical except that the clearance between the lines on the Green Line is slightly wider than on the Red Line. This will allow wider metro trains be run on the same tracks if a proposed upgrade to full metro service is implemented. This is possible because the route uses an old railway line and as such has few interactions with vehicular or pedestrian traffic. The Red Line was constructed largely on or beside public roads and is not suited to wider and faster metro trains.
The main engineering structures on the Green Line at present are Milltown Viaduct, also known as The Nine Arches, a large stone viaduct dating from 1854, and the William Dargan Bridge, a large new cable-stayed suspension bridge at Taney Cross, near Dundrum town centre.
Luas Tram - George's Quay (new stop)
A new $133m (€90m) extension of Dublin's Luas tram's Red Line from Busáras to The Point has opened in Ireland.
The 1.5km light rail line serves the city's Docklands area with stops at George's Dock, Mayor Square, Spencer Dock and The Point and is the first addition to the city's tram line since it opened in 2004.